Project of the Year 2017 Rehabilitation Runner Up: McGuire AFB ‘Largest CIPP Liner Ever Installed’
US Pipelining LLC recently completed a major military project that included the cured-in-place-pipe (CIPP) rehabilitation of nearly 1,000 lf of 10-ft diameter storm water piping located beneath the airfield apron of the McGuire Air Force Base in Burlington, New Jersey. As confirmed through Insituform, this is the largest CIPP liner ever installed.
“Working with our resin supplier, AOC, and our liner manufacturer, Manufactured Technologies Corporation (MTC), we were able to achieve something that, to the best of our knowledge, has never been attempted,” states Gary Horwedel, general manager of US Pipelining, who has been involved in infrastructure rehabilitation and repair using trenchless technologies for more than 25 years.
Pemex Oil – Monterrey Mexico Oil Pipe Lining Job Profile
When Pemex Oil refinery located in Monterrey Mexico was experiencing problems with a 48 inch diameter process oil line they called the best in the business to handle the problem, US Pipelining.
United States Army Corps Of Engineers
Marmet West Virginia – Military Job Profile
When the US Army Corps of Engineers had questions about how to rehabilitate a 30 inch diameter storm line that was thirty feet deep US Pipelining LLC. had the answers. Early on in the job project US Pipelining LLC. was contacted by a US Army Corps of Engineer. Aside from the usual questions about CIPP, some of the more serious concerns were,
US Pipelining LLC, Receives Major Military Pipe Lining Rehabilitation Project
US Pipelining, LLC, an emerging leader in Cured-In-Place Pipelining solutions (CIPP), announced today the award of a major military project which includes the cured in place pipe lining and rehabilitation of nearly one thousand (1,000’) linear feet of ten foot diameter (10’) storm water piping located beneath the airfield apron of McGuire Air Force Base located in Burlington County, NJ.
US Pipelining, LLC Completes Major Military CIPP Pipe Lining Rehabilitation Project
Philadelphia, PA – US Pipelining, LLC., an emerging leader in Cured-In-Place-Pipelining solutions (CIPP), announced today the completion of a major military project which included the cured-in-place-pipe rehabilitation of nearly one thousand (1,000’) linear feet of ten foot diameter (10’) storm water piping located beneath the airfield apron of the McGuire Air Force Base in Burlington, NJ. The over-the-hole installation of 10’ diameter CIPP liner is among the largest to have been successfully completed anywhere.
On Site At Volcano Bay, Universal’s Water Park in Orlando Florida.
US Pipe Lining LLC. On Site, at Universal’s Newest theme park. Volcano, Bay! When this state of the art water park started experiencing issues with a section of both leaking, and highly inaccessible piping. It was US Pipe Lining, that sprung into action, to completely restore their failing section of pipe, right away! By performing the pipe restoration at night, and within only one weekend. Allowed for the park, to remain open during the day, while the repairs to this section of piping, took place at night. Both saving the park time, and money! And keeping their visitors from all over the world, happy by allowing them to visit the park any day they like, without interruption. The lining material, used to repair this failing pipe, was a multiple layer, polyurethane membrane.
Record Setting “One Piece” CIPP Installation By US Pipelining, LLC Stretches Nearly Half a Mile Over the York River
US Pipelining, LLC., an emerging leader in Cured-In-Place-Pipe lining solutions (CIPP), announces the completion of a major waterway project. The recent project at Plains All American Pipeline’s Yorktown Terminal in Yorktown Virginia is believed to be the longest single-shot, “one-piece” cured-in-place-pipe (CIPP) liner ever installed.
US Pipelining, LLC Completes U.S Military Infrastructure Cured-In-Place-Pipe (CIPP) Pipe Lining Project
US Pipelining, LLC., an emerging leader in Cured-In-Place-Pipelining solutions (CIPP), announced today the completion of a military project which included cured-in-place-pipe rehabilitation at the Fort Lesley J. McNair Army Post in Washington, DC. Fort McNair, a part of the Joint Base Myer-Henderson Hall, is the headquarters of the Army’s Military District of Washington and home of the National Defense University, as well as the official residence of the US Army’s vice chief of staff.
Shell Oil – Puget Sound, Anacortes Washington – Oil Pipe Lining Job Profile
In 2016 the Shell Oil refinery facility located in Anacortes Washington was experiencing failure in a 36” diameter transmission line. This steel pipe was installed more than 30 years ago. It ran process crude oil from one holding tank to another. The 36” steel pipe ran 1,600 feet from one tank to another and had a working pressure of 80 psi. Due to the fact, that the facility was built on an island off the coast of Washington state made it difficult logistically to get all of the necessary equipment there to install the pipe lining material.
US Pipelining Completes Major Refinery Pipeline Rehabilitation Project
Philadelphia, PA – US Pipelining, LLC., an emerging leader in learn more about Cured in Place Pipe, announced today the completion of a major refinery rehabilitation project which included the rehabilitation of nearly 1500 linear feet of piping ranging from 15 inches to 28 inches in diameter. The project, located in Delaware City, Delaware, further solidifies US Pipelining’s strategic position in the highly specialized refinery field.